Sorry, you need to enable JavaScript to visit this website.
.pdf asset-performance field_planning_color fit_for_purpose_color production_optimization_recovery_color kpi-box kpi-money kpi-time ::before

Get your copy of "HPump system delivered four-year run time and avoided replacement pumps"

An oil and gas producer in Alberta, Canada,
required a surface pump to re-inject produced
water. The disposal volume was 2,400 BFPD
at 1,100 psi discharge. A competitor’s pump
failed after only 30 days, caused by fluid
starvation and accelerated pump wear. Key
issues for pump selection were abrasion
resistance, maintenance expense, and the
ability to control the speed of the pump using
a variable speed drive (VSD). pwi-hpump-delivered-4-year-run-time-canada-cs.pdf