Sorry, you need to enable JavaScript to visit this website.
.pdf asset-performance field_planning_color fit_for_purpose_color production_optimization_recovery_color kpi-box kpi-money kpi-time ::before

Get your copy of "xSight CCL service saved $1 million USD, reduced risks in drift run"

A North Sea operator needed to set a whipstock in 7-in. casing on a well with a 14,993-ft (4,570-m) measured depth, a 8,776-ft (2,675-m) total vertical depth, and an inclination of 62.54°. There was no casing tally available, and the target depth for setting the whipstock was in between perforations. xSight-Saved-One-Million-Dollars-North-Sea-cs.pdf