Get your copy of "WASP system saved $2 million USD in subsea well abandonment job"

A North Sea operator was abandoning four
suspended subsea wells. Per the UK Oil and
Gas Guidelines, three wells were classified
as 2.2, and one well as category 2.1. The
guidelines required that a 500-ft. (152.4-m)
surface environmental cement plug was to
be placed across the annuli, followed by
severance and removal of the subsea
wellheads 10 ft (3.0 m) below seabed. WASP-System-Saved-2-Million-in-Rig-Costs-North-Sea-cs.pdf