Sorry, you need to enable JavaScript to visit this website.
.pdf asset-performance field_planning_color fit_for_purpose_color production_optimization_recovery_color kpi-box kpi-money kpi-time ::before

Get your copy of "Transcoil rigless deployed ESP system gets stranded production back on line, reduces installation time by more than 50%"

An operator in the Middle East was experiencing
long lead times to get a rig on location to retrieve
and install electrical submersible pumping (ESP)
systems. Yearly rig schedules made it difficult to
arrange unplanned workovers, resulting in down
time of 3 to 6 months or longer. The operator was
looking for an alternative deployment method to
eliminate the down time and cost associated with
using a rig to retrieve and install ESP systems. TransCoil-Reduced-Install-Time-50-Percent-in-Middle-East-cs.pdf