Sorry, you need to enable JavaScript to visit this website.
.pdf asset-performance field_planning_color fit_for_purpose_color production_optimization_recovery_color kpi-box kpi-money kpi-time ::before

Get your copy of "RiskGuard Pressure solution delivered an HP/HT well in a previously inaccessible reservoir"

In 1974 an operator was drilling an HP/HT wildcat well in a new block located in the South China Sea when it experienced a severe kick that put the crew and the entire operation at unacceptable risk. The operator was able to regain well control, but it was forced to sidetrack the well. The incident was so
severe that the operator made the decision
to suspend any future wells in the block. RiskGuard-Pressure-Solution-Delivered-HPHT-Well-asia-cs.pdf