Get your copy of "MAX-PRIME solution stabilized well, minimized formation damage"
The operator’s objective was to drill a 2,460 ft (750 m) horizontal section through a reservoir interval with a diameter of 9.5 in., ensuring a high-quality well without formation damage, imparting wellbore stability avoiding any fluid losses.
MAX-PRIME-Delivered-Excellent-Wellbore-Stability-Brazil-cs.pdf