Sorry, you need to enable JavaScript to visit this website.
.pdf asset-performance field_planning_color fit_for_purpose_color production_optimization_recovery_color kpi-box kpi-money kpi-time ::before

Get your copy of "MAX-BRIDGE bridging solution enabled drilling with water-based mud in challenging overbalanced well"

In Oman’s mature Saih Raw field, an operator had historically experienced sloughing shale, downhole losses, and incidents of differential sticking. Due to the low formation pressures found in fields such as this one, there is often only a narrow operating margin between the pore pressure and formation breakdown. The low pressure does not allow for increased drilling fluid density, therefore causing a dilemma over how to address the borehole stability requirements without inducing fractures. MAX-BRIDGE-Solution-enabled-drilling-water-based-mud-Oman-cs.pdf