Sorry, you need to enable JavaScript to visit this website.
.pdf asset-performance field_planning_color fit_for_purpose_color production_optimization_recovery_color kpi-box kpi-money kpi-time ::before

Get your copy of "MAX-BRIDGE bridging solution increased ROP 320% and decreased mud losses 74%"

As fields mature, permeable formations
can become depleted, leading to differential sticking, wellbore instability, and whole mud losses. If one or more of these were to occur, it could significantly add to the cost of any drilling program in terms of contingency liners, fishing or sidetracking, nonproductive time (NPT), or even having to abandon
the well. MAX-BRIDGE-increased-ROP-decreased-mud-losses-Egypt-cs.pdf