Sorry, you need to enable JavaScript to visit this website.
.pdf asset-performance field_planning_color fit_for_purpose_color production_optimization_recovery_color kpi-box kpi-money kpi-time ::before

Get your copy of "FORSA PAO2016 dispersant ensured pipeline operation"

The operator of a major oil transmission line in the Central Rockies was pigging a 16-mile (25.7-km), 12-in. (30.5 cm) diameter section of pipeline weekly, primarily to remove paraffin buildup. During each pigging operation, the cumulative mass of paraffin delivered to the pig receiver would plug the line, causing it to overpressure to the point of bursting the rupture disk. FORSA-dispersant-ensured-unhinterrupted-ops-rockies-cs.pdf