Get your copy of "FASTrak Prism service helped save 48 hours rig time"

An operator developing a deepwater field in Central Africa needed to drill an extended-reach well intersecting two reservoir compartments and complete it for commingled production. A key challenge of the project was to to design the best completion based on fluid characterization from each reservoir, and calculate how much each reservoir would contribute to total production. FASTrak-Prism-helped-save-48-hours-rig-time-Angola-cs.pdf