Sorry, you need to enable JavaScript to visit this website.
.pdf asset-performance field_planning_color fit_for_purpose_color production_optimization_recovery_color kpi-box kpi-money kpi-time ::before

Get your copy of "FTeX service acquired pressure data in variable formation permeability, saved 20 hours rig time"

An operator of a major North Sea field
development needed fluid type and
contact information for a well drilled into a
formation characterized by a wide variation
of permeability—ranging from high to very
low—and with a high overbalance pressure
in several zones. The operator needed
to conduct a formation pressure testing
operation to obtain this information and
plan a large number of pressure stations
across the different zones. But with a tight
timeline for execution, the operator had to
measure formation pressure with as few
trips as possible downhole. ftex-saved-20-hours-rig-time-north-sea-cs.pdf