Sorry, you need to enable JavaScript to visit this website.
.pdf asset-performance field_planning_color fit_for_purpose_color production_optimization_recovery_color kpi-box kpi-money kpi-time ::before

Get your copy of "VisiTrak service navigated 2,838 feet of pay sand without pilot hole"

An operator drilling in the Carapebus reservoir off the shore of Brazil requested that Baker Hughes, a GE company (BHGE), drill an 8-½-in., 3,340-ft (1,018-m) horizontal section in the reservoir’s facies 1 sand. The heel of the well was in an area below seismic resolution. visitrak-navigated-2838-feet-of-pay-sand-without-pilot-hole-brazil-cs.pdf