Get your copy of "Integrated solution of GaugePro Echo digital reamer and AutoTrak G3 RSS cut plan by 6 days"

A deepwater operator in the Gulf of Mexico
planned a well with 2.5° build-up rate
(BUR) to reach geological targets and avoid
nearby wells. In the build section of the
well, the operator also needed to remove
the remaining pilot hole so that casing
could reach an optimum depth between a
sand formation and a deeper slump with
unknown depth spacing. gaugepro-echo-autotrack-cut-plan-by-6-days-gom-cs.pdf