Get your copy of "Deeper setting depth of slimline ESP system increases production 150%"

An operator producing from the Wasatch
formation in Utah set a 5-in., 18-lb. liner in
a 7-in. cased well at 6,900 ft total vertical
depth (TVD). Taking advantage of this thick
source rock, the completion has a vertically
perforated zone from 13,300 ft to 15,400 ft.
To maximize production potential, the
operator wanted to be able to set inside
the liner close to the perforations but was
reaching the depth limitations of some
artificial lift system equipment and related
capabilities. slimline-increases-production-150-percent-utah-cs.pdf