Sorry, you need to enable JavaScript to visit this website.
.pdf asset-performance field_planning_color fit_for_purpose_color production_optimization_recovery_color kpi-box kpi-money kpi-time ::before

Get your copy of "ESP system with FLEXPump17.5 technology extended run life 31%"

An operator had a very challenging well
that produced high gas content with rapid
declination of well production. The previous
artificial lift system had failed due to low/no
production after it ran for 396 days. Due
to the presence of gas, the rapid pump
intake pressure (PIP) started to decrease.
The total production had dropped from
1,800 BFPD to 900 BFPD and the well was
finally shut in due to low production. The
operator considered a pump with extended
operating range that would have handled
high gas production around 800 mcf. flexpump175-extended-run-life-31-percent-cs.pdf