Get your copy of "Slimline CENesis PHASE solution increased ESP system uptime to 97% in extremely gassy well"

A major operator in the Permian basin’s
Wolfcamp formation had a problem
horizontal well where two conventional
electrical submersible pumping (ESP)
systems had failed within eight months.
The failures were related to handling
gas-to-liquid ratio as high as 5,000 SCF/
STB. The production rates were too high
for conversion to a rod lift system and the
operator wanted an alternative solution
in order to operate in the high gas rate
environment. cenesis-phase-increased-system-uptime-to-97%-permian- basin-cs.pdf