Sorry, you need to enable JavaScript to visit this website.
.pdf asset-performance field_planning_color fit_for_purpose_color production_optimization_recovery_color kpi-box kpi-money kpi-time ::before

Get your copy of "Versa-Drive milled 30 plugs at 23,000 ft, opened 31 new production stages"

A customer in the Haynesville Shale drilled a lateral well, completing it with 4 ½-in. casing. The lateral was horizontal at 90°, over 10,000 ft. (3048 m) long, with 82 plugs deployed. A plug and perforate fracking operation was conducted. During the subsequent plug milling, the customer encountered friction lock-up with coil tubing at 19,604 ft (5975 m). With the target depth at 23,035 ft (7021 m), 30 plugs remained in the completion. A competing oilfield service company attempted to reach the target, but failed. Versa-Drive-milled-3000ft-Louisana-cs.pdf