Sorry, you need to enable JavaScript to visit this website.
.pdf asset-performance field_planning_color fit_for_purpose_color production_optimization_recovery_color kpi-box kpi-money kpi-time ::before

Get your copy of "VAS accurately predicted production in Permian Basin laterals"

An operator in the Permian Basin had drilled a pilot hole in the Wolfcamp field and needed to complete an evaluation to determine the locations to land two 2-mile (3,219 m) laterals. The company required the laterals to land in the optimum pay zones for oil and gas production. There was only a 24-hour window to complete the evaluation project before lateral drilling commenced. VAS-accurately-predicted-production-Pemian-Basin-laterals-cs.pdf