Get your copy of "SBT reduces time, cost, and risk for North Sea well decommissioning"

A major operator in the North Sea planned
a decommissioning campaign to safely
abandon more than 100 wells. Traditionally,
the operator had removed the completion,
then evaluated the cement behind the
casing to establish cement isolation over
the producing and water-bearing zones.
Subsequently, cement barriers were pumped
into the identified zones and the plugs were
set at the desired depths. sbt-well-decomm-north-sea-cs.pdf