Sorry, you need to enable JavaScript to visit this website.
.pdf asset-performance field_planning_color fit_for_purpose_color production_optimization_recovery_color kpi-box kpi-money kpi-time ::before

Get your copy of "RCX Service Saved Rig Time While Obtaining Pressures in HP/HT Well"

A North Sea operator needed to obtain well pressure samples where formation pressures varied from 9,430–15,950 psi and wellbore temperatures reach „363°F (184°C). Pipe conveyed logging (PCL) was not an option due to the client’s short time-frame and the temperature of this high-pressure/high-temperature (HP/HT) well. RCX North Sea HPHT Case Study.pdf