Sorry, you need to enable JavaScript to visit this website.
.pdf asset-performance field_planning_color fit_for_purpose_color production_optimization_recovery_color kpi-box kpi-money kpi-time ::before

Get your copy of "Perseus cutter combined three processes in one run, saved USD $150,000"

A major customer in the Norwegian North Sea was performing a plug-and-abandon operation and sought to reduce the number of runs needed as well as operational costs. The customer needed to displace the well from brine to water-based mud, drill and tag a newly set 200 m (656 ft) long cement plug at 1794 m (5,885 ft) measured depth (MD), and cut 9 ⅝-in. 53,5# P-110 casing at 932 m (3,057 ft) MD. With conventional technology, one dedicated run would be needed to displace the fluids and dress of the cement plug, and a second run to cut the casing. In a deepwater well, the costs of multiple run are constantly escalating. Perseus-cutter-saves-10-hours-north-sea-cs.pdf