Sorry, you need to enable JavaScript to visit this website.
.pdf asset-performance field_planning_color fit_for_purpose_color production_optimization_recovery_color kpi-box kpi-money kpi-time ::before

Get your copy of "OptiStriker system refractured six zones in one trip, boosted Permian well production"

An operator in the Permian Basin needed to find a way to revive an existing well while keeping operational and remediation costs low. The well had originally been drilled and completed with a traditional plug-and-perf completion method, but our customer needed a way to boost production by fracturing zones that had originally been bypassed. OptiStriker-refractured-six-zones-boosted-Permian-production-cs.pdf