Sorry, you need to enable JavaScript to visit this website.
.pdf asset-performance field_planning_color fit_for_purpose_color production_optimization_recovery_color kpi-box kpi-money kpi-time ::before

Get your copy of "NeutraProp LWC neutral-wettability proppant saved $438,000 USD in flowback costs"

An operator working in the deepwater Gulf
of Mexico needed a frac pack to complete a
new well. The well had very low bottomhole
pressure, low reservoir energy, and no gas lift. neutraprop-saved-480000-flowback-costs-gom-cs.pdf