Sorry, you need to enable JavaScript to visit this website.
.pdf asset-performance field_planning_color fit_for_purpose_color production_optimization_recovery_color kpi-box kpi-money kpi-time ::before

Get your copy of "Navi-Drill DuraMax improved drill time by 40% and ROP by 35%"

An operator in North Dakota’s Williston
Basin was developing a lateral Three Forks
well. Drill bit consumption was reducing
performance, with 8 drill bits damaged on
14 previous wells. Baker Hughes, a GE
company (BHGE), had been using the
BHGE 5-in. Xtreme eXtend motor with
various bits with reasonable success but
experienced moderate vibration levels,
impacting measurement while drilling
(MWD) reliability. Navi-Drill-DuraMax-improved-drill-time-and-ROP-NDakota-cs.pdf