Sorry, you need to enable JavaScript to visit this website.
.pdf asset-performance field_planning_color fit_for_purpose_color production_optimization_recovery_color kpi-box kpi-money kpi-time ::before

Get your copy of "METAL MUNCHER cutters milled packer in 4 hours, retrieved fish in one trip"

A customer in northern Oklahoma needed to retrieve a permanent production packer that preset 1,700 ft (518.16 m) from the surface. Completion of the well was being held up and the project would soon be behind schedule. For that reason, the operator required the packer be removed in the same trip as it was milled, and that the packer be milled in the quickest way possible. AMT-mills-packer-in-4hr-Oklahoma-cs..pdf