Sorry, you need to enable JavaScript to visit this website.
.pdf asset-performance field_planning_color fit_for_purpose_color production_optimization_recovery_color kpi-box kpi-money kpi-time ::before

Get your copy of "METAL MUNCHER AMT performed 17 casing cuts in one run"

An operator was performing a plug and
abandonment operation on one of their
wells in the North Sea. The well
conditions did not allow for the casing to
be milled out due to the high equivalent
circulating density (ECD), so they reached
out to Baker Hughes, a GE company
(BHGE), for a solution to efficiently cut
and pull 1,143.6 ft (348.57 m) of 133/8-in.,
72 lb/ft. P-110 casing. _Metal-Muncher-Performs-17-Casing-Cuts-in-One-Run-North-Sea-cs.pdf