Sorry, you need to enable JavaScript to visit this website.
.pdf asset-performance field_planning_color fit_for_purpose_color production_optimization_recovery_color kpi-box kpi-money kpi-time ::before

Get your copy of "Integrated Well Services cut drilling time and costs 40% in unstable well"

A producer in northeast India wanted to
improve production in a deviated,
underperforming well. Baker Hughes, a
GE company (BHGE), used several
integrated technologies to identify and
resolve challenges that included
mitigating well stability, inadequate
weight transfer to bit, tight spots, bit
balling, and a very low rate of
penetration (ROP) resulting from lengthy
completion times and high bit
consumption. Integrated-Well-Services-cut-drilling-time-and-costs-40%-in-unstable-well-India-cs (002).pdf