A customer wanted to plug and abandon (P&A) one of the deepest wells ever drilled in Vietnam. Another operator had attempted the P&A, but had failed after four days and many trial runs. The well had 20 in. (1 in. wall thickness [WT]) x 36 in. (2 in. WT) casing set at 2,172 ft (662 m) with water depth at 1,867 ft (569 m). The customer then called in Baker Hughes, a GE company (BHGE), who successfully performed the P&A in two days. Subsea-p-and-a-in-2-hours-vietnam-cs.pdf