Get your copy of "ESPs successfully supplied 13.8-MW geothermal power plant"

A developer completed the construction of a 13.8-MW organic Rankine turbine geothermal power plant in 2018 after successful drilling and well tests. The higher elevation of the power plant compared to the neighboring facilities in the region meant that artesian production of the five wells was not an option. Baker Hughes, a GE company (BHGE), was contracted to supply a turnkey production solution. esps-supply-geothermal-plant-cs.pdf