Sorry, you need to enable JavaScript to visit this website.
.pdf asset-performance field_planning_color fit_for_purpose_color production_optimization_recovery_color kpi-box kpi-money kpi-time ::before

Get your copy of "ESP system increased production 59% for geothermal project"

Water production at a geothermal renewable energy project was limited to about 2,200 gpm (8.328 m3/s) per well with line shaft turbine pump systems. The installation times for turbine pump systems are more than double that of electrical submersible pumping (ESP) systems. They are also limited in depth setting, because the shaft string requires constant lubrication, which can contaminate the reservoir. 79597 esp-system-increased-production-59-percent-geothermal-cs.pdf